We specialize in performing API 4G Cat III & IV Inspections and API Re-certification all over the world on a daily basis. Our team of qualified engineers ensure that drilling rig and related equipment are inspected in accordance with API RP 4G, API RP 7L, API RP 8B specification requirements.
As drilling rigs are used over several years, it is important to ensure their reliability and safety through regular inspections. Our team conducts inspections using various methods such as VT, NDT, Ultrasonic thickness. We thoroughly inspect all rig equipment, including mast, substructure, crown block, drawworks, rotary table, mud pump, hoisting system, and mud system, in line with the inspection standards for the CAT IV inspection.
Our services aim to ensure that your drilling rig equipment is operating at optimal levels, minimizing the risk of downtime and accidents. We pride ourselves on delivering quality and reliable inspection services, no matter where you are located in the world. Contact us today to discuss your API 4G Cat III & IV inspection and re-certification needs, and let us help you maintain a safe and reliable drilling operation.
Inspection components
Rig Main components | Other components | ||
1 | Substructure | 1 | rig tool |
2 | Mast | 2 | Air tank |
3 | Crown Block | 3 | Climb assist |
4 | Traveling Block | 4 | Escape device |
5 | Hook | 5 | Anti-dropping device |
6 | Swivel | 6 | Bop Hoisting System |
7 | Draw-works | 7 | Air Winch |
8 | Rotary table | ||
9 | Mud pump | ||
10 | Standpipe/High Pressure | ||
11 | DeadlineAnchor | ||
NOTE: Main components issue the COC and inspection report ,other components only issue the inspection report |
Post time: May-08-2023